The work includes providing materials, equipment, and labor required for the construction of Parking Package B. This work includes grading (finish grade only in the parking lots and to subgrade in areas not paved); storm sewers and structures that serve parking lot; concrete curb and gutter; asphalt paving; concrete paving; parking lot light conduits and sleeving; conduits and sleeving for emergency phones and security cameras; sleeving for irrigation systems; installation and maintenance of erosion control and SWPPP; adjustment of utility manholes, valves, and vaults as necessary; relocation/installation of Natural Gas line piping; and incidental related work as shown in the plans. The Government requires that the Natural Gas Line, as shown in the Contract Documents, be installed during the Contractor's initial phase of construction activities.