Project Summary
VEMAC, Inc. served as Design/Builder on the MCS Distribution Center Project and self-performed all concrete work. The MCS Project was a fast track design/build of a 214,600-sq.ft. facility on a 14-acre site and included a warehouse, office and associated truck court. This project once again features VEMAC, Inc's concrete expertise and technical skill. Examples of project specification include:
A warehouse built with a 5 ½in. reinforced concrete slab on grade and 8 in.tilt up concrete panel walls averaging 42 feet in height
A 10,000-sq. ft. office designed with a 1,800 sq. ft.mezzanine and a 4 inch reinforced floating slab on metal deck for the 2nd floor
A 93,600-sq.ft.truck court constructed with a 7in. reinforced concrete over compacted sub-grade. The project was completed in eight months with the office construction being completed within ten weeks after the warehouse was occupied.
A warehouse built with a 5 ½in. reinforced concrete slab on grade and 8 in.tilt up concrete panel walls averaging 42 feet in height
A 10,000-sq. ft. office designed with a 1,800 sq. ft.mezzanine and a 4 inch reinforced floating slab on metal deck for the 2nd floor
A 93,600-sq.ft.truck court constructed with a 7in. reinforced concrete over compacted sub-grade. The project was completed in eight months with the office construction being completed within ten weeks after the warehouse was occupied.