|
Stonelake IIThe project consisted of 3 buildings totaling 512,000 SF.
Thin concrete pavement totaling 512,377 SF. The entire project required 25,500 CY of concrete. General Contractor: Harvey Builders
Architect: Powers Brown Architecture Location: 12100 Emerald Pass Dr., El Paso, Texas 79928 Market: Industrial Square Feet: 512,000 |