Some stringless radius curb.
|
Truck courts almost done at Eastlake logistics phase 2
|
TPA Socorro Logistics almost at an end!
Had the time of our lives with a great group of people on-site, estimating team, the developer along with the OptiPave System team. |
Smooth sailing at Socorro Logistics, tilt panels utilizing Somero Enterprises tilt screed.
|
Opti-pave update.
|
1160LF of curb & gutter at Socorro Logistics.
|
Socorro logistics first OptiPave System placement!!
65,745sf (1,109cy). *If you are wondering what that uncured strip in middle is, it’s a flow line, that still has to be worked manually not robotically. |
Square Feet: 837,252.
|