Westpark 2 completed, Westpark 3 begins and Westpark 4 forthcoming of almost 2 million sf of fiber reinforced concrete pavement. This pavement was specifically designed for special overload capacity (110,000lbs vs 80,000lbs), specific to Santa Teresa port of entry for semis transferring loads from Mexico to Westpark industrial park. Special thanks to Robert Yates, PE for all the traffic studies / design documents and for Bryan Birdwell, FACI for all document reviews.
|
Westpark IIIGeneral Contractor: MW Builders, Inc.
Architect: RGA Architects Location: Colton Road, Santa Teresa, NM 88088 Client Market: Industrial |
Panels up at Westpark 3
|
Down in the West Texas town of El Paso.
|
Are you not entertained??
|
If you want to learn about Sawcut timing here’s a video.
|
Playing all night long.
|
Westpark 3 full steam ahead!!
|