VEMAC
  • About Us
  • Services
  • Contact Us
  • Careers
Westpark 2 completed, Westpark 3 begins and Westpark 4 forthcoming of almost 2 million sf of fiber reinforced concrete pavement. This pavement was specifically designed for special overload capacity (110,000lbs vs 80,000lbs), specific to Santa Teresa port of entry for semis transferring loads from Mexico to Westpark industrial park. Special thanks to Robert Yates, PE for all the traffic studies / design documents and for Bryan Birdwell, FACI for all document reviews.

Westpark III

General Contractor: MW Builders, Inc.
​Architect: RGA Architects

Location: Colton Road, Santa Teresa, NM 88088
Client Market: Industrial 
Picture
Panels up at Westpark 3​
Down in the West Texas town of El Paso.
Are you not entertained??
If you want to learn about Sawcut timing here’s a video. ​
Playing all night long.​
​Westpark 3 full steam ahead!!

1919 Rio Grande, El Paso, Texas 79902    |    Directions   |    P: (915) 566-1911

   Copyright © 2026 VEMAC LLC. All Rights Reserved.
Private Policy​   |   Terms and Conditions   |   Design by RL
  • About Us
  • Services
  • Contact Us
  • Careers